MAINTENANCE
EQUIPMENT AND TOOLS REQUIRED
5 - 2
I-E96-192-5A
®
EQUIPMENT AND TOOLS REQUIRED
Following are tools and equipment required for maintenance
procedures.
•
Antistatic vacuum.
•
Bladed torque screwdriver (0 to 2.7 Newton meters - 0 to
24 inch-pounds).
•
4-inch bladed screwdriver.
•
16-inch bladed screwdriver.
•
Isopropyl alcohol (99.5 percent electronic grade).
•
Foam tipped swabs.
•
Eberhard Faber (400A) pink pearl eraser or equivalent.
•
Fiberglass burnishing brush.
•
Distilled water.
•
Lint free cloth.
•
Mild, all purpose commercial spray cleaner.
Table 5-1. Preventive Maintenance Schedule and Check List
Task
Frequency
Check printer, clean and lubricate.
1
1 month
Be sure fans are turning. With power off, wipe dust off all fan blades.
Check cabinet and module for dust. Clean as necessary using an antistatic vacuum.
3 months
Adjust printer per manufacturer's instructions.
Check power supply output. Adjust power supply if needed (
DC Power Test in Section 5).
Check alarm and display LEDs.
Check the cabinet air filters. Clean or replace them as necessary. Check the air filter more
frequently in excessively dirty environments.
6 months
Check all signal, power and ground connections within the cabinet and verify that they are
secure. Refer to procedure.
Check power supply outputs. Refer to procedure.
Check the quality of the plant power and grounding system. Follow the power and
grounding system verification procedures in the INFI 90 OPEN site preparation and plan-
ning instruction.
12 months
Inspect and check the power entry panel. In high vibration environments testing may be
necessary at shorter intervals. Refer to procedure.
2 years
Replace power supply. Call Elsag Bailey sales and service for information.
5 years
Complete all appropriate tasks in this table.
Shutdown
NOTE:
1. Adjust the printer using the procedures in the manufacturer's documentation.