INTRODUCTION
I-E96-192-5A
5 - 1
SECTION 5 - MAINTENANCE
INTRODUCTION
This section contains a preventive maintenance schedule for
the OIC console. Be sure to follow all warnings, cautions and
notes. Put boards containing semiconductors into antistatic
bags when stored or shipped back to the factory. Do not repair
printed circuit boards in the field. All repairs and adjustments
should be performed by qualified personnel.
The reliability of any stand alone product or control system is
affected by the maintenance of the equipment. Elsag Bailey
recommends that all equipment users practice a preventive
maintenance program that will keep the equipment operating
at an optimum level.
This section presents procedures that the customer should be
able to perform on site. These preventive maintenance proce-
dures should be used as a guideline to assist in establishing
good preventive maintenance practices. Select the minimum
steps required to meet the cleaning needs of your system.
Personnel performing preventive maintenance should meet the
following qualifications:
•
Maintenance personnel should be qualified electrical tech-
nicians or engineers that know the proper use of test equip-
ment.
•
Maintenance personnel should be familiar with both the
OIC and the main OIS console, have experience working
with process control systems, and know what precautions
to take when working on live AC.
PREVENTIVE MAINTENANCE SCHEDULE
Table
is the preventive maintenance schedule and check
list for the OIC console. The table lists the preventive mainte-
nance tasks in groups according to their specified maintenance
interval. Some tasks in Table
are self explanatory. Instruc-
tion for tasks that require further explanation are covered
under
STANDARD PREVENTIVE MAINTENANCE PROCE-
or in the manufacturer's documentation supplied with
the console.