![background image](http://html1.mh-extra.com/html/backyard-products/shedmaster-homestead/shedmaster-homestead_assembly-manual_3358441030.webp)
28
FRONT GABLE
PARTS REQUIRED:
3" (7,6 cm)
x4
Front Gable Unit
Your front gable unit is now installed.
FINISH
2" (5,1 cm)
x23
2" (5,1 cm)
Nails
Gable
Nailer
6"
(15,2 cm)
CKB
NAIL FIRST
2" (5,1 cm)
1-1/2"
(3,8 cm)
Measure
and mark
1-1/2"
(3,8 cm)
Measure
and mark
Fig. A
3" (7,6 cm)
Screws
NAIL FIRST
2" (5,1 cm)
2
3
1
BEGIN
Continue nailing lower edge of panels to gable nailer and top plate with 2" nails spaced 6" apart.
Working inside, secure gable unit with 3" screws angled into (2) gable connectors
CKB
at an angle
(Fig. A)
.
Measure 1-1/2" down from top plate and mark at each side as shown.
Set gable unit on top plate. Fasten with (1) 2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.