40
2
METAL RIDGE CAP
PARTS REQUIRED:
Install 1st ridge cap flush to front of roof panels across the peak of the roof.
Foam enclosures go in-between the metal roof and the bottom edge of the ridge cap, as shown.
Secure with (4) 7/8" screws 1/2" from edge of ridge cap
(Fig A)
.
Install screws in second peak from end of ridge cap
(Fig B)
.
BEGIN
¸
1
Ridge Cap
4" x 4" x 54" (10,2 x 10,2 x 137,2 cm)
x2
x12
7/8" (2,2 cm)
Closure Strip
24" (61 cm)
x10
Flush
Flush
Fig. A
Closure
Strip
Ridge Cap
7/8" (2,2 cm)
Screw
FINISH
Your ridge cap are now installed.
Fig. B
2nd peak
from end
Install 2nd ridge cap flush to back of roof panels, across the peak of the roof
and overlapping the installed ridge cap.
Install foam encolsures as in STEP - 1 with (8) 7/8" screws.
Install screws in second peak from end of ridge cap
(Fig B)
.
1/2"
(1,3 cm)
From edge of ridge cap
1/2"
(1,3 cm)
Fig. B
2nd peak
from end