10
FINISH
LEVEL AND SQUARE FLOOR FRAME
Before attaching foor decking, it is important to level and square the foor frame.
A level and square foor frame is required to correctly construct your shed.
BEGIN
2
3
4
1
Use level and check the frame is level before applying floor panels.
Check for frame squareness by measuring diagonally across corners.
If the measurements are the same, the frame is square.
The diagonal measurement will be approximately 151-9/16" (385 cm).
When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at
ends of each runner.
Move to the opposite end of the frame.
Secure the frame to 4x4 runners with one fastener at ends of each runner making sure
the frame remains square
(Fig. A)
.
Once the floor frame is level and square, fasten the frame to the 4x4 runners
wherever the frame contacts the 4x4 runners.
See page 7 for the preferred floor leveling method.
First, secure at ends with one fastener.
Second, secure at ends with one fastener.
Fig. A
DOOR
120"
(304,8 cm)
92-5/8"
(235,3 cm)
151-9/16"
(385 cm)
151-9/16"
(385 cm)