![background image](http://html1.mh-extra.com/html/backyard-products/shedmaster-homestead/shedmaster-homestead_assembly-manual_3358441033.webp)
31
Install fascia with the primed side facing up.
x44
1" (2,5 cm)
EEB
EEB
SOFFIT TRIM UNITS
PARTS REQUIRED:
BEGIN
1
2
3" (7,6 cm)
x8
FINISH
Your soffit trim units are now installed.
Repeat steps to install opposite side trim unit.
Arrange (1) soffit nailer
EEB
, (1)
2-5/8" x 25-1/8"
and (1)
2-5/8" x 72"
soffit fascia boards on a flat surface.
Adjust fascia boards to measurements shown at ends of
EEB
. Flush fascia boards at seam
and along
one edge
of
EEB
.
Secure parts with 1" screws in pattern shown.
Install soffit unit flush to top of front and back gable fillers.
Install the 1/8" fascia overlap toward the bottom.
Secure 3/8" fascia to gable filler with (2) 1" screws at each end
(Fig. A)
.
Secure soffit nailer
EEB
to gable filler with (2) 3" screws at each end
(Fig. A)
.
1"
(2,5 cm)
Screws
x2
3/8 x 2-5/8 x 25-1/8" (1 x 6,7 x 63,8 cm)
x2
3/8 x 2-5/8 x 72" (1 x 6,7 x 182,9 cm)
x2
2 x 3 x 94-1/8" (5,1 x 7,6 x 239,1 cm)
EEB
1-1/2"
(3,8 cm)
1-1/2"
(3,8 cm)
Flush
Seam
Flush
Flush
Flush
G
A
B
LE
F
IL
LE
R
3"
(7,6 cm)
Screws
1"
(2,5 cm)
Screws
Fig. A
1/8"
(3,2 mm)
Flush
Flush
2-5/8"x 72"
2-5/8"x 25-1/8"