![background image](http://html1.mh-extra.com/html/backyard-products/shedmaster-homestead/shedmaster-homestead_assembly-manual_3358441025.webp)
23
LEFT WALL INSTALLATION
2
Secure back wall panel to side wall with (1) 2" screw
into left wall top and bottom plate
(Fig. A, Fig.B)
.
2" (5,1 cm)
x18
2" (5,1 cm)
x2
PARTS REQUIRED:
ENSURE TOP OF WALL FRAMES ARE FLUSH.
BEGIN
Center left wall assembly on the 96" (243,8 cm)
floor dimension.
Ensure the 1" (2,5 cm) wall panel overlap is to the bottom.
1
3" (7,6 cm)
x1
x13
1-1/2" (3,8 cm)
1"
(2,5 cm)
DOOR
Flush
Fig. A
2"
(5,1 cm)
Screw
3
3
Nail lower edge of side wall panels to floor
with 2" nails spaced 6" apart.
Angle nails into floor frame
(Fig. C)
.
Nail back wall panel to side wall stud with
1-1/2" nails spaced 6" apart.
Your left wall is now installed.
FINISH
Secure wall top plates with (1) 3" screw
angled at the corner
(Fig. D)
.
4
Secure left wall bottom plate to floor
with 3" nails
(Fig. C)
.
6"
(15,2 cm)
2" (5,1 cm)
Nails
1-1/2" (3,8 cm)
Nails
6" (15,2 cm)
3" (7,6 cm)
Screw
Fig. D
3" (7,6 cm)
Nails
2"
(5,1 cm)
Screw
Fig. B
Flush
3" (7,6 cm)
x8
Nail 2" nails first.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. C