35
1-1/2" (3,8 cm)
Screws
Using (2) clamps, tightly clamp a string or chalkline to front and back gable trim.
Position string flush to top corner edge of gable trim
(Fig. A, Fig. B)
.
2
Front
METAL ROOF PANELS
PARTS REQUIRED:
BEGIN
¸
1
Fig. A
Mark each center line dimension shown on top of gable trim. Place the first roof panel with front bottom corner
3/4" back from the gable trim
(Fig. C)
and bottom edge in line with string.
Referencing the center line marks on top of the gable trim, secure panel to soffit trim and purlins
with (3) 1-1/2" screws.
Install screws in panel valley
(Fig. D)
nearest edge.
Fig. D
Roof Panel
Valley
Metal Roof Panel
25-1/4" x 71-1/2" (64,1 x 184,2 cm)
x1
x4
1-1/2" (3,8 cm)
NOTE: Panels must
remain fush
to string during
installation!
Fig. B
BEGIN HERE
Flush e
dge
to st
ring
Clamp
String
Clamp
String
Flush string
to top corner.
Clamp string
here
Flush string
to top corner.
Roof panel
offset
from trim.
Fig. C
3/4"
(
1,9 cm)
45-5/16"
(115,1 cm)
21-5/16"
(54,1 cm)
69-5/16"
(