Initial Assembly
09
PLEASE RECYCLE ANY UNWANTED PACKAGING RESPONSIBLY
Saw Body Assembly
Having unpacked the boxes, put the parts and
components where they are readily to hand. Break
down the main box by knocking the sides away (be
careful of exposed nails etc.), but leave the machine
sitting on its pallet. Identify the short rear panel
with the dust extraction cutout (2), locate the dust
extraction moulding (4) and fit to the panel using
the nuts and bolts (5) provided. (See fig 1)
The orientation of the moulding should leave the
30mm outlet pointing upwards i.e. pointing up the
long length of the panel. Put the panel aside, and
locate the lower leg columns (3) and 4 No. M8x16mm
(5A) bolts, nuts and double washers. Fix the lower legs
to the upper legs using a washered bolt through the
legs and secure with washer and nut, only turn the nuts
up finger tight at this time. (See fig 2) Locate the rear
extention table (6), table support brackets (7) and 4 No.
M8 x20mm caphead bolts and washers (9).
NOTE: the manufacturer has fitted adjusting bolts
to the brackets, these are the faces that back
against the legs.
NOTE: The upper leg columns (3) has welded nuts
to the inside face to mount the support brackets (7)
Fasten the support brackets (7) to the upper leg
columns (3) using the bolts washers (9) and finger
tighten the at this time. (See fig 4-5-6)
Fig 1
Fig 2
2
3
4
5
Fig 3
Fig 4
7
5A
Summary of Contents for AT254SB
Page 37: ...Wiring Diagram 37 ...
Page 38: ...Exploded Diagrams Lists 38 DIAGRAM A ...
Page 40: ...Exploded Diagrams Lists 40 DIAGRAM B Part 1 ...
Page 41: ...Exploded Diagrams Lists 41 DIAGRAM B Part 2 ...
Page 44: ...Exploded Diagrams Lists 44 DIAGRAM D ...
Page 49: ...Notes 49 ...
Page 50: ...Notes 50 ...
Page 51: ...Notes 51 ...