Setting the Machine
25
The overall setting process is done in 3
phases. 1) Setting the table level against
the main table; front and rear. 2) Setting
the sliding table/main table gap, to
ensure a parallel feed. 3) Raising the
sliding table slightly proud of the main
table. The reason it is done in this
manner and this order, is that phases 1)
and 2) are interactive e.g. tilting the
sliding table to bring it level can change
the gap between the two tables, (See
fig 90) whereas if the tables are set level
a uniform adjustment to the brackets,
should not alter the level, merely the gap.
(See figs 90 & 91) The final phase is only
a ‘jacking’ exercise and should not affect
the previous settings.
Make sure all the fixing bolts are
generally finger tight.
Place a level across the main and the
sliding tables to check both are level
Place a level in the horizontal position on
the sliding table and adjust until it’s level
Fig 86
Fig 87
Use the height adjusting blocks to adjust
the height of the sliding table
The mounting bracket (36) fixing bolts (A)
and (B)
Fig 88
Fig 89
B
A
Fig 90
Continues Over....
Summary of Contents for AT254SB
Page 37: ...Wiring Diagram 37 ...
Page 38: ...Exploded Diagrams Lists 38 DIAGRAM A ...
Page 40: ...Exploded Diagrams Lists 40 DIAGRAM B Part 1 ...
Page 41: ...Exploded Diagrams Lists 41 DIAGRAM B Part 2 ...
Page 44: ...Exploded Diagrams Lists 44 DIAGRAM D ...
Page 49: ...Notes 49 ...
Page 50: ...Notes 50 ...
Page 51: ...Notes 51 ...