Initial Assembly
13
Introduce the slot in the riving knife (14) over the two centre line bolts, behind the washers
and nip the bolts to just hold the riving knife against the mounting plate. Set the riving knife so
its close to the blade, (gap with in 8mm). Tighten the clamping bolts securely. (See figs 23-24)
Replace the saw gullet.
Fig 23
Fig 24
14
8mm gap
Mounting plate
Locate the saw hood guard (13), the 30mm extraction hose (17) and the 50mm hose clips (16).
Introduce the pin bolt through the pre-drilled hole in the guard (13) and lightly screw on the
clamping knob. Lower the guard so the pin bolt fits into the curved slot in the riving knife then
tighten the clamping knob to pinch the guard to the riving knife. (See fig 26-27)
Fig 25
Fig 26
Fig 27
Fig 28
Clamping knob
Curved slot
Pin bolt
Push the hose clips (16) over the ends of the hose (17), push the hose onto the dust extraction
outlet on the guard (13) and the main dust extraction moulding (4) and tighten the hose clips to
hold it in place. (See figs 28-29)
13
17
16
Continues Over....
Summary of Contents for AT254SB
Page 37: ...Wiring Diagram 37 ...
Page 38: ...Exploded Diagrams Lists 38 DIAGRAM A ...
Page 40: ...Exploded Diagrams Lists 40 DIAGRAM B Part 1 ...
Page 41: ...Exploded Diagrams Lists 41 DIAGRAM B Part 2 ...
Page 44: ...Exploded Diagrams Lists 44 DIAGRAM D ...
Page 49: ...Notes 49 ...
Page 50: ...Notes 50 ...
Page 51: ...Notes 51 ...