background image

12

Assembly Instruction

FV1 / FV3 / FV4

P

reParing

 a

ssembly

04

04

I

nstallatIon

 

step

  1: 

i

nspection

 

beFore

 

the

 

instaLLation

Test kit for drives

Order number:                       
Application:

Supply voltage:  
Drive types: 

   

Drive current:

   

Display:

    

Ambient temperature:  
Plastic housing:  
Weight:     
Feature / equipment:    

533981

Test kit to check running direction and 
communication of drives 24V DC or 
230V AC (including batteries)
230V AC
24V DC / 230V AC
max. 3 A
drive current, battery charge 
-5 °C ... + 40 °C 
250 x 220 x 210 mm 
approx. 3,6 kg 
Control elements: 2 sw 1 button

n

ote

We recommend the use of our test kit for 
the inspection of drives with the rated 
voltage 24V= / 230V~ (see table below). 
Damaged products may not be operated 
under any circumstance.

It is imperative that the suffi ciently
mechanical stiffness of the fastener type 
as well as of the swivel range of the drive 
is observed. 
If this is not guaranteed another type of 
fastening or another type of drive must 
be selected.

The support surface of the frame brackets or 
casement brackets must rest completely on 
the window or frame profi le. There must be
no tilting of the fastening elements during
extension and retraction of the drives. A
safe and solid fastening must be ensured
at the window profi le.

Storage of drives at the construction site

Protective measures against damages, dust, moisture or 
contamination shall be taken. Store drives intermediately 
only in dry and well ventilated rooms.

Inspection of drives before installation

Check drives and window before installation for good
mechanical condition and completeness. The chains / spind-
les of the drives must be extendable or retractable easily. 
The casement must run smoothly and the weight must be 
in balance.  

The test procedure of drives may only be performed on a 
non-slip and secured mat or a test fi xture. During the test 
run the test element must not be interfered with. The test 
my only be conducted by or under the supervision of expert 
personnel.
For testing chain drives the chain must be extended and 
retracted at an angle of approx. 90°. The spindle tubes of 
spindle drives in round housing tubes must be secured 
against independent spinning before starting the test to 
avoid deviations in the integrated position encoder.

Inspection of the intended use

The planned use of the drive must be checked for com-
pliance with its intended use. If used otherwise the liability 
and warranty claim expires.

  

Predictable misuse 

It is imperative that foreseeable misuse of drives is avoided! 
Here are a few examples:
•  do not connect 24 V DC drives to a 230 V AC mains
 voltage,
•  observe synchronous run and sequence control by drives
  with multiple interconnection (if existing), 
•  use drives only indoors,
•  avoid additional force infl uences, e.g. transverse forces.

Testing mechanical requirements 

Prior to the start of the installation check whether :
•  the support surface and the profi le static for the load 
  transmission is suffi cient,
•  a support construction for the secure fastening of the
  drives is required,
•  cold bridges (thermal separation) are avoidable at
  action points,
•  there is suffi cient space for the swivel movement of the
 drive.
If not, counter measures must be taken!

c

aution

w

arning

Important instructions for a safe instal-
lation. Observe all instructions, wrong 
installation may result in serious injury! 

Ubatt

fmot

Imax

Imot

__________ 

__________ 

__________ 

__________

_________ 

Imp/s

Umot

A

 A

V

       V

__________ 

 A

=

 =

=

       =

_________ 

%

0

0

A

24 V =

B

230 V ~

L

ι

L

ιι

N

PE

Prüfkoffer / Test Kit

24 V =   /  230 V~

OFF

A

B

ON

24 V =

230 V ~

Spannung

voltage

Taster

push button

Schalter

switch

Summary of Contents for FV1

Page 1: ...according to Machinery Directive 2006 42 EC annex VI FV1 FV3 FV4 Locking drive for windows Assembly and Commissioning Instructions...

Page 2: ...outs Application examples for locking drive FV Installation step 6 Drill holes according to mounting variants Installation step 7 Remove the end caps from the locking drive Installation step 8 Assembl...

Page 3: ...lt in irreversible injuries or death Failure to comply with the warning notes can re sult in minor or moderate reversible injuries Failure to comply with the warning notes can lead to damage to proper...

Page 4: ...cation as NRWG natural smoke and heat exhaust ventilator s for ventilation without dual purpose for ventilation in accordance with EN12101 2 The need for a risk assessment at the installation site due...

Page 5: ...rding to EN12101 2 with dual purpose for ventilation 1 Z 109 Natural ventilation Installation height of drive and lower edge of casement 2 5 m above floor ZAA 20 2 Opening at HSK 200 mm and Speed at H...

Page 6: ...ite The connection assignment the electrical supply data see product lable and performance limits see technical data as well as the mounting and installation instructions of the drive must be strictly...

Page 7: ...r the installation The types of cable cable lengths and cross sections shall be selected in accordance with the manufacturer s technical data If necessary the cable types shall be coordinated with the...

Page 8: ...d or when a window which has been opened by a smoke and heat exhaust system is clo sing The operating element of hold to run switches must be installed within di rect view from the window but apart fr...

Page 9: ...ontrol for drives S3 S12 Star wiring Current of the drives does not run over FV4 Sequence control via communication wire TECHNICAL DATA UN Rated voltage 24V DC 19 V 28 V IN Rated current 0 6 A I0 Quie...

Page 10: ...105 FV4 L 1x 1 515130 Double right hand 1200 FV1 R 2x E6 C 0 1 515111 FV3 R 2x 1 515110 FV4 R 2x 1 515131 Double right hand 2000 FV1 R 2x E6 C 0 1 515113 FV3 R 2x 1 515112 FV4 R 2x 1 515132 Triple rig...

Page 11: ...ee profile lengths are effective distances between two locking points Corner and edge distances shall be cal culated as straight lines Only the worst case with secured values and application ranges mu...

Page 12: ...ight must be in balance The test procedure of drives may only be performed on a non slip and secured mat or a test fixture During the test run the test element must not be interfered with The test my...

Page 13: ...parts and constructed to a complete machine at the window without impairing the safety and health of persons 1 The design of the drive must fulfill the requirements 2 The fastening accessories casemen...

Page 14: ...ring start up of locking drives FV3 the 24V control voltage may be switched on only with opened casement unhinged opening drive Unhinge the opening drive Switch off the control voltage from the openin...

Page 15: ...opening Casement assembly Bottom hung inward opening Casement assembly View on aluminium window View on aluminium window min 50 10 7 12 52 16 24 5 5 5 35 B22 B18 B20 FV RA FL 13 min 38 23 10 16 0 10...

Page 16: ...hung inward opening Horizontal vertical pivot Window versions Bottom hung inward opening Top hung inward opening Side hung inward opening Horizontal vertical pivot 05 28 281 281 584 1146 5 5 x4 1200...

Page 17: ...rd opening Side hung inward opening Horizontal vertical pivot Hole layouts for locking drive FV 05 See Installation step 8a See Installation step 8a 28 281 281 692 973 5 5 x6 2000 16 32 10 min 3 min 1...

Page 18: ...outward opening Horizontal vertical pivot Window versions Bottom hung outward opening Top hung outward opening Side hung outward opening Horizontal vertical pivot 05 5 5 x5 56 14 18 15 5 24 5 5 5 11...

Page 19: ...ontal vertical pivot Window versions Bottom hung outward opening Top hung outward opening Side hung outward opening Horizontal vertical pivot 5 5 x5 15 5 min 10 24 5 1384 56 14 18 5 5 11 x3 2000 27 47...

Page 20: ...ording to mounting variants 1 2 3 4 5 Installation step 6 Installation step 7 Drill holes according to mounting variants L O C T I T E 1 2 3 4 5 FL RA Determine fastenings Produce drill holes with app...

Page 21: ...re parallel to casement edge Assembly FV1 FV3 FV4 Installation step 8a FV1 FV3 FV4 Frame assembly inward opening windows Connect the connecting cable AK to terminal strip see chapter Connecting cable...

Page 22: ...re they are parallel to casement edge Adapter plate B22 for relocation of the mounting holes of the locking bracket B18 outside the glasing bead of outward opening windows Is not included in the scope...

Page 23: ...er Connecting cable and DIP switch Check the locking position on DIP switch Observe the locking direction of the locking fitting see chapter Connecting cable and DIP switch Fit end caps with screws Re...

Page 24: ...lectronic overload disconnection 1 2 3 4 5 1 2 3 4 5 FV3 FV4 AK AK LED LED AK from opening drive 1 2 3 4 5 FV3 1 Anschlusskabel und DIP Schalter Installation step 9 Connecting cable and DIP switch The...

Page 25: ...Installing the M COM see separate Installation Instructions for M COM and make the electrical connection in accordance with chapter Electric connection Installation step 12 Hinge opening drive on case...

Page 26: ...r closing procedure the cable will not be damaged by shearing off kinking crushing Protect cable feedthrough in profile e g by using cable bushings cable transitions RA RA FL BD protective cable hose...

Page 27: ...chronized multi drive operation WH is used for commu nication in systems with synchronized multi drive operation Version Z contact max 24 V 500 mA min 10mA In drives KS4 standard CLOSE optional OPEN B...

Page 28: ...rol from control unit Line end module for SHEVS applications line monitoring Opening drive only solo operation 24V DC max 0 8 A SHEVS applications require a line monitoring line end module to be conne...

Page 29: ...and two locking drives Configuration is done by M COM Individual configuration FV4 Multi drive operation with M COM and locking drive series connection 235 235 235 drive drive drive locking drive A ma...

Page 30: ...B cable connection cable http www aumueller gmbh de Downloads Features Equipment Power supply 24V DC is not included in the scope of delivery Any extended settings require a software licence Any recon...

Page 31: ...Directive Separate documents for performing a risk assessment can be downloaded from the homepage of Firm aum ller aumatIc GmbH www aumueller gmbh de saFety check and test run Formula to calculate the...

Page 32: ...milarly qualified per son to avoid endangerment It is recommended to conclude a maintenance contract A sample main tenance contract can be downloaded from the homepage of Firm Aum ller Aumatic GmbH ww...

Page 33: ...l use The warranty period for delivered material is twelve months Warranty and liability claims for personal injuries or material damages are excluded if caused by one or more of the following No prop...

Page 34: ...34 Assembly Instruction FV1 FV3 FV4 08...

Page 35: ...eral Terms and Conditions of aum ller automatIc GmbH apply to all offers supplies and services The publication of these assembly and commissioning instructions supersedes all previous editions certiFi...

Page 36: ...9000018401_V2 0_KW21 22...

Reviews: