
OPERATION
29
jr.. The Hipot test will be controlled by the Hyamp jr. automatically, through the
interconnecting control cables.
1. INSTRUCTIONS FOR USER-FABRICATED INTERCONNECT CABLES.
The following diagrams show how to connect to the Remote I/O of both units. The
associated pin numbers are given for the connectors on both units and the pins to be wired
together. Refer to section
D
of this manual for the required parts to make these cables.
A. Sequential Testing
HYAMP jr. \ Hypot II Sequential Connection
B. Simultaneous Testing
HYAMP jr. \ Hypot II Simultaneous Connections
HYAMP jr. OUT Hypot II I/O HYAMP jr. IN
1
•
1
•
•
1
2
•
•
2
•
2
3
•
•
3
•
3
4
•
4
•
•
4
5
•
•
5
•
5
6
•
•
6
•
6
7
•
•
7
•
7
8
•
•
8
•
8
9
•
•
9
•
9
Male Plug
Female Plug
Female Plug
HYAMP jr. OUT
Hypot II I/O
HYAMP jr. IN
1
•
1
•
•
1
2
•
•
2
•
2
3
•
•
3
•
3
4
•
4
•
•
4
5
•
•
5
•
5
6
•
•
6
•
6
7
•
•
7
•
7
8
•
•
8
•
8
9
•
•
9
•
9
Male Plug
Female Plug
Female Plug
Summary of Contents for 3030D
Page 4: ......
Page 5: ...SECTION 1 OPERATORS MANUAL ...
Page 38: ...OPTIONS 34 This page left intentionally blank ...
Page 39: ...SECTION 2 SERVICE MANUAL ...