ASI – The leader in Advanced Systems Integration | www.asimedical.net
TRiTOn
™
ADVAnceD DenTAl SySTeMS
®
2025M | 2025M/DV | 2025M/AR
3
65-2025M Rev. B
7.9 Replacing the Vacuum Pump .................................................................................................. 47
7.10 Replacing Tubing in Purge Pump ............................................................................................. 47
7.11 Replacing the Water Relay ...................................................................................................48
7.12 Replacing Bulkhead Connector .............................................................................................48
7.13 Replacing Pucks in Control Block ........................................................................................... 49
7.14 Fiber Optics & Instruments .....................................................................................................50
7.15 Closed Water System ......................................................................................................... 52
7.16 Compressed Air System ........................................................................................................ 53
7.71 Vacuum System ................................................................................................................... 55
8.0 ScHeMATicS ....................................................................................................................57
8.1 Schematic, Delivery System Tubing .......................................................................................... 57
8.2 Schematic, Control Block Diagram .......................................................................................... 58
8.3 Schematic, Electrical 115V~ 60Hz Voltage Selected .................................................................. 59
8.4 Schematic, Electrical 230V~ 50Hz Voltage Selected ..................................................................60
8.5 Schematic, Electrical Wiring of Delivery System (Upper Compartment) ............................................ 61
8.6 Schematic, Electrical Wiring – Compressor & Vacuum Utilities (Lower Compartment) .......................... 62
8.7 Schematic, Pressure Switch – Air Compressor (Lower Compartment) ...............................................63
9.0 illUSTRATeD PARTS liST .....................................................................................................64
9.1 Delivery System ..................................................................................................................64
9.2 Delivery Instrument Components .............................................................................................66
9.3 Air/Water Syringe (PN 20-0008) ..........................................................................................68
9.4 Closed Water System (PN 80-0215) ....................................................................................... 70
9.5 Delivery System Rear View .................................................................................................... 72
9.6 Cart System ....................................................................................................................... 74
9.7 Air Compressor, Complete Assembly (PN 85-0001) ................................................................... 76
9.8 Air Compressor, Main Component (PN 40-0019) ...................................................................... 78
9.9 Vacuum Pump, Complete Assembly (PN 85-0002) .....................................................................80
9.10 Vacuum Pump, Main Component (PN 40-0020) ....................................................................... 82
9.11 Air Tank, Dual Bracketed Complete Assembly (PN 80-0192) ........................................................84
9.12 Sediment Separator and Holding Tank (PN 80-0188 ..................................................................86
9.13 Purge Pump (PN 80-0214) .................................................................................................... 87
9.14 Foot Control, Wet/Dry (PN 80-0112) ...................................................................................... 88
9.15 Satelec/Acteon Ultrasonic .....................................................................................................90
9.16 KaVo ................................................................................................................................ 91
9.15 Service Parts Kit (PN 95-0107) ...............................................................................................92
9.16 Cross Reference Parts List ...................................................................................................... 94
10.0 ReFeRence liSTS ...............................................................................................................98
10.1 Delivery System Preventative Maintenance Schedule ................................................................... 98