141
PR617A
12. Install the inlet boot on the CVT cover; then install the
CVT cooling duct and secure with the sheet metal screw.
Tighten all fasteners and clamps securely.
PR615
PR671A
13. Install and secure the CVT cooling outlet boot to the
CVT cover making sure to properly orient the outlet
duct.
PR669
14. Connect the starter cable to the starter; then connect the
engine harness ground to the engine. Tighten the fasten-
ers securely.
PR605A
PR604A
15. Install the air filter assembly and secure with four sheet
metal screws; then secure the intake boot to the throttle
body. Tighten the screws and clamp to 30 in.-lb.
PR603A
16. Connect the gasline hoses to the fuel rails making sure
the “quick-disconnect” couplers properly lock onto the
fuel injector rails.