
5800 SE 78th St. Ocala, FL 34472
14
P: (800) 327-3015
Modular HURRiCHiLL Installation & Operations Manual
Step
Description
Diagram
15
Make the electrical connections to the
electrical panel.
16
Route the cables and connectors through
the line set opening.
17
Make the electrical connections inside the
evaporator assembly.
If the blast chiller is equipped with pass-thru
door, install the provided J-boxes and make
the connections for the door heater and the
door switch. The pig-tail cables coming from
the controller will be clearly marked.
18
Insulate all penetrations into the cabinet
using the provided patch foam.