
5800 SE 78th St. Ocala, FL 34472
12
P: (800) 327-3015
Modular HURRiCHiLL Installation & Operations Manual
Step
Description
Diagram
9
Secure the evaporator to the roof panel
using the 3/8” screws, washers and nuts
provided.
Take your time and tighten each screw one
turn at a time in a diagonal pattern to avoid
damaging the screws.
10
Remove and discard the temporary wooden
support frame.
11
Use the provided screws to install the lower
evaporator brackets. The wall panel is not
pre-drilled and will need to be tapped in the
field.