Using the machine
UF with HB volumetric remote control, see also page 66!
1. Prepare and stir the spray liquid correctly in
accordance with the instructions from the
crop protection agent manufacturer. Refer
to the section "Preparing the spray liquid",
Seite 138.
2. Set the desired stirring stage (normally stir-
ring stage "2"). Refer to the "Agitator" sec-
tion, page 70.
3. Switch on the operating terminal.
4. Fold out the sprayer boom, see page 85.
5. Depending on the nozzles being used, set
the working height of the sprayer boom
(gap between the nozzles and the crop) ac-
cording to the spray table.
6. Move switch tap
F
to position
0
.
7. Move switch tap
E
to position
0
.
8. Move switch tap
D
(optional) to the
position.
9. Move switch tap
B
to the
position.
10. Move switch tap
A
to the
position.
10.1 Move switch tap
C
to a medium stir-
ring stage.
11. Control terminal / AMASPRAY
+
: Enter the
"target rate" value for the required spray
rate or check the stored value.
AMASET
+
: Manual operation HB: Set the
calculated spray pressure.
12. Run the pump at pump operating speed
(min. 400 rpm).
13. Select the right tractor gear and move off.
14. Switch off spraying via the operating termi-
nal.
Fig. 115
156
UF BAG0012.11 04.19
Summary of Contents for UF 1201
Page 19: ...General safety instructions Super S boom Fig 4 Q Plus boom Fig 5 UF BAG0012 11 04 19 19 ...
Page 204: ...Liquid circuit 14 Liquid circuit single nozzle control 204 UF BAG0012 11 04 19 ...
Page 205: ...Liquid circuit Part width section control UF BAG0012 11 04 19 205 ...
Page 210: ...Spray table Fig 157 210 UF BAG0012 11 04 19 ...
Page 219: ...Spray table UF BAG0012 11 04 19 219 ...
Page 220: ......