Cleaning, maintenance and repairs
Winter storage of the Manual operation HB
For winter storage or longer periods out of opera-
tion, the hose lines of the HB
valve chest must
be drained.
1. Undo the sleeve nut from the pressure-relief
hose (Fig. 141/1) and the return hose (Fig.
141/2) and dump the residue.
2. Swivel the switch tap and part width section
valves several times until liquid is no longer
coming out.
3. Resecure the pressure-relief hose and re-
turn hose to the valve chest.
Fig. 133
4. Release the spring clips (Fig. 142/1) on all
the butt joint connectors.
5. Pull apart the butt joint connectors on all the
part width section hoses, thus disconnect-
ing the part width section hoses.
6. Let the residue run out and blow out the
hoses at the nozzle end with compressed
air.
7. Resecure the butt joint connectors with
spring clips.
Fig. 134
UF BAG0012.11 04.19
177
Summary of Contents for UF 1201
Page 19: ...General safety instructions Super S boom Fig 4 Q Plus boom Fig 5 UF BAG0012 11 04 19 19 ...
Page 204: ...Liquid circuit 14 Liquid circuit single nozzle control 204 UF BAG0012 11 04 19 ...
Page 205: ...Liquid circuit Part width section control UF BAG0012 11 04 19 205 ...
Page 210: ...Spray table Fig 157 210 UF BAG0012 11 04 19 ...
Page 219: ...Spray table UF BAG0012 11 04 19 219 ...
Page 220: ......