![Amazone UF 1201 Operating Manual Download Page 98](http://html1.mh-extra.com/html/amazone/uf-1201/uf-1201_operating-manual_2919803098.webp)
Construction and function of the sprayer boom
Working with the sprayer boom folded out on one side
Only possible with hydraulic preselected folding (optional).
See operating manual for software ISOBUS.
The sprayer boom is fully folded out.
1. Actuate tractor control unit.
→
Raise the boom to a medium height.
→
Swing compensation locks automatically.
2. Preselect the boom on the operating terminal which is to be fold-
ed in.
3. Actuate tractor control unit
green
.
→
The selected boom folds in.
WARNING
After folding in, the boom lifts into the transport position.
→
Interrupt the folding process at the right point.
4. Align the sprayer boom using tilt adjustment so it is parallel to
the target surface.
5. Set the spraying height for the sprayer boom such that the
sprayer boom is a minimum of 1 m off the ground.
6. Switch off the part width sections of the folded-in boom.
7. During spraying operation, drive at a significantly reduced speed.
After one-sided spraying:
8. Cancel the preselection on the operating terminal.
9. Actuate tractor control unit
green
until
→
the folded-in boom is fully folded out again.
→
the swing compensation unlocks.
10. Switch all part width sections back on.
98
UF BAG0012.11 04.19
Summary of Contents for UF 1201
Page 19: ...General safety instructions Super S boom Fig 4 Q Plus boom Fig 5 UF BAG0012 11 04 19 19 ...
Page 204: ...Liquid circuit 14 Liquid circuit single nozzle control 204 UF BAG0012 11 04 19 ...
Page 205: ...Liquid circuit Part width section control UF BAG0012 11 04 19 205 ...
Page 210: ...Spray table Fig 157 210 UF BAG0012 11 04 19 ...
Page 219: ...Spray table UF BAG0012 11 04 19 219 ...
Page 220: ......