Commissioning
7.1.1.2
Calculation of the required minimum ballasting at the front G
V min
of the tractor to en-
sure steering capability
b
a
b
T
b
T
d
c
G
G
L
V
H
V
+
•
•
+
•
−
+
•
=
2
,
0
)
(
min
Enter the numeric value for the calculated minimum ballast, G
V min
,
required on the front of the tractor, in the table (page 119).
7.1.1.3
Calculation of the actual front axle load of the tractor T
V tat
b
d
c
G
b
T
b
a
G
T
H
V
V
tat
V
)
(
)
(
+
•
−
•
+
+
•
=
Enter the numeric value for the calculated actual front axle load and
the approved tractor front axle load specified in the tractor operating
manual, in the table (page 119).
7.1.1.4
Calculation of the actual total weight of the combined tractor and machine
H
L
V
tat
G
T
G
G
+
+
=
Enter the numeric value for the calculated actual total weight and the
approved total tractor weight specified in the tractor operating manual
in the table (page 119).
7.1.1.5
Calculation of the actual rear axle load of the tractor T
H tat
tat
V
tat
tat
H
T
G
T
−
=
Enter the numeric value for the calculated actual rear axle load and
the approved tractor rear axle load specified in the tractor operating
manual in the table (page 119).
7.1.1.6
Tractor tyre load-bearing capacity
Enter double the value (two tyres) of the permissible load capacity
(see, for example, the tyre manufacturer's documentation) in the table
(page 119).
118
UF BAG0012.11 04.19
Summary of Contents for UF 1201
Page 19: ...General safety instructions Super S boom Fig 4 Q Plus boom Fig 5 UF BAG0012 11 04 19 19 ...
Page 204: ...Liquid circuit 14 Liquid circuit single nozzle control 204 UF BAG0012 11 04 19 ...
Page 205: ...Liquid circuit Part width section control UF BAG0012 11 04 19 205 ...
Page 210: ...Spray table Fig 157 210 UF BAG0012 11 04 19 ...
Page 219: ...Spray table UF BAG0012 11 04 19 219 ...
Page 220: ......