![Amazone Precea 4500-2 Original Operating Manual Download Page 75](http://html1.mh-extra.com/html/amazone/precea-4500-2/precea-4500-2_original-operating-manual_2919774075.webp)
10. Slowly switch on the filling auger's drive on the
ball valve
1
.
The fill level in the fertiliser hopper rises.
11. Monitor the fill level through the inspection
window.
12.
When the fill level rises beyond the edge of the
inspection window,
reduce the filling auger speed with the ball valve
2
.
13.
When the fertiliser hopper is full,
slowly switch off the filling auger with the ball
valve.
14. Switch off the "beige" tractor control unit.
15. Swivel in the filling chute.
16. Close the cover tarpaulin of the filling funnel.
17.
To swivel the filling auger back into the parking
position,
actuate the "green 1" tractor control unit until the
filling auger has reached the end position.
1
2
CMS-I-00001895
6.5.4.3 Filling the fertiliser hopper with the filling auger
NOTE
The guard screen and function screen in the
fertiliser hopper are closed. Only a closed guard
screen and function screen can prevent fertiliser
clumps and/or foreign objects from entering the
fertiliser hopper and clogging the metering unit.
CMS-T-00001912-C.1
6 | Preparing the machine
Preparing the implement for operation
MG6149-EN-GB | J.1 | 18.10.2022 | © AMAZONE
69
Summary of Contents for Precea 4500-2
Page 255: ......