![Amazone Precea 4500-2 Original Operating Manual Download Page 162](http://html1.mh-extra.com/html/amazone/precea-4500-2/precea-4500-2_original-operating-manual_2919774162.webp)
19. Connect the ISOBUS to the tractor.
20. Restart the implement.
21.
To enter the changed working width on the
control terminal,
see "ISOBUS software operating manual" >
"Defining the geometry".
6.5.29.2 Establishing the energy supply
1.
Disconnect the ISOBUS from the tractor.
2.
To activate the coulter,
disconnect the coulter wiring harness
1
from
the bridge plug
3
.
3.
Connect the implement wiring harness
2
to the
coulter wiring harness
1
.
4.
Seal the bridge plug with a dust cap.
CMS-I-00003830
6.5.29.3 Establishing the hydraulic supply
REQUIREMENTS
The implement is lifted
The fan is switched off
The tractor and implement are secured
1.
To unfold the implement,
see "Unfolding the implement sections".
2.
To set the coulter pressure to zero,
refer to the ISOBUS operating manual, "Adjusting
the coulter pressure".
3.
Lower the implement and move the three-point
hydraulic system of tractor into float position.
The coulter pressure cylinders retract and the
coulter pressure is relieved.
4.
Switch off the fan.
5.
Secure the tractor and implement.
1
3
2
CMS-I-00007310
CMS-T-00005490-C.1
CMS-T-00005484-C.1
6 | Preparing the machine
Preparing the implement for operation
MG6149-EN-GB | J.1 | 18.10.2022 | © AMAZONE
156
Summary of Contents for Precea 4500-2
Page 255: ......