![Amazone Precea 4500-2 Original Operating Manual Download Page 165](http://html1.mh-extra.com/html/amazone/precea-4500-2/precea-4500-2_original-operating-manual_2919774165.webp)
6.5.29.4 Establishing the air and fertiliser supply on the rear hopper
1.
Open the sliding shutter
1
on the fertiliser
metering unit.
CMS-I-00003915
2.
Install the fertiliser hose
1
on the fertiliser
metering unit.
3.
Install the clamp
2
.
4.
Install the air supply
3
on the air distributor.
5.
Install the clamp
4
.
CMS-I-00003916
6.5.29.5 Establishing the air and fertiliser supply on the distributor head
1.
To restore the fertiliser flow on implements with
distributor heads:
actuate the lever
1
.
The fertiliser is conveyed into the fertiliser coulter.
CMS-I-00003960
CMS-T-00005487-C.1
CMS-T-00005489-D.1
6 | Preparing the machine
Preparing the implement for operation
MG6149-EN-GB | J.1 | 18.10.2022 | © AMAZONE
159
Summary of Contents for Precea 4500-2
Page 255: ......