Telephony Hardware Manual 27
C
H A P T E R
2
Telephony Hardware Handling
Requirements
This chapter details the following:
•
Proper grounding procedures
•
Using an uninterruptible power supply
•
Operating environment
•
Proper board handling procedures
•
Proper system shutdown
•
On-board battery
Proper Grounding and Loop Current
Proper grounding is
essential
for any PBX system. Run a #6 AWG wire from the server
chassis to protection earth ground. Don’t wait for a problem to arise before taking this
step. Make sure this is one of the first things you do before turning the AltiGen system
on.
For more information on grounding and loop current issues, please refer to the
Knowledgebase at AltiGen’s dealer web site at
https://dealer.altigen.com.
Uninterruptible Power Supply (UPS)
Using a UPS prevents power fluctuations and surges on power sources from utilities.
Windows files can be corrupted as a result of power failure or improper system
shutdown.
Caution!
Corrupted files may not be repairable
and may require re-installation of
Windows and MAX Communication Server. To protect your system from surges
and power outages, it is strongly recommended that an adequate UPS
(providing between 600VA and 1500VA) and power surge protector is used
with the system.
Summary of Contents for MAX1000
Page 1: ...Telephony Hardware Manual 12 2009 4413 0001 6 5 Update1 ...
Page 6: ...2 Telephony Hardware Manual ...
Page 14: ...FCC Requirements 10 Telephony Hardware Manual ...
Page 30: ...UL Hardware Preparation 26 Telephony Hardware Manual ...
Page 56: ...MAX2000 System 52 Telephony Hardware Manual ...
Page 66: ...Installing and Removing an Access Board 62 Telephony Hardware Manual ...