SECTION 2
Installation
Tools Required
1. Power
Drill
2. Drill bit size #37 (0.104 inch) (2.6 mm)
3. 9/16 inch (14 mm) diameter hole saw for cutting into side wall
4. Reciprocating saw with saw blades for cutting sheet metal
5. Pilot drill sized to fit saw blade
6. Phillips head screwdriver with #1 point
7. Small slotted screwdriver for securing wires to terminal block.
WARNING:
If the monitor will be installed on a hood with
Hardiboard™ fiber-cement panels or similar material, use a
special hole saw designed for glass and other hard, abrasive
materials. Failure to do so may shatter or crack the panel.
DANGER:
Always wear eye protection when using power tools.
Observe all necessary precautions when installing or repairing
monitors near electrical equipment.
Mounting the Monitor
1. Determine where the monitor will be mounted. Use the cardboard
template supplied as a guide for the size of the installed product
and the hole needed to be cut out of the hood. The cutout required
is 3 inches high by 2 inches wide (76.2 x 50.8 mm), which is the
typical size required for a single switch electrical box. If the
cardboard template is not available, a dimensioned diagram is at
the back of this manual (see Section 7).
2. Using the template, mark off the 3 inch high by 2 inch wide (76.2
x 50.8 mm) hole necessary to clear the back enclosure portion of
the monitor. Mark off the two mounting screw hole locations.
3. Drill a pilot hole in each of the four corners. Use the saw to cut out
the hole. A suitable nibbling tool may also be used.
4. Drill the two #37 (0.104 inch) (2.6 mm) mounting screw holes.