x550 Series Installation Guide for Virtual Chassis Stacking
131
2. Power on all the switches in the stack at the same time. Refer to
“Powering On a Switch” on page 137.
Refer to “Power Specifications” on page 186 for the power
specifications of the switches.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.
E3
Note
Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible.
E5
3. Wait two or three minutes for the switches to select a master switch
and to assign the ID numbers.
The stack is operational. The ID numbers are automatically stored in
special files in the flash memories of the switches and are retained by
the devices even if you reset or power cycle the stack.
4. To continue with the installation, go to “Starting a Local Management
Summary of Contents for AT-x550-18XSPQm
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 50: ...Chapter 1 Overview 50 ...
Page 78: ...Chapter 2 Virtual Chassis Stacking 78 ...
Page 90: ...Chapter 3 Beginning the Installation 90 ...
Page 110: ...Chapter 4 Installing the Switch on a Table or in an Equipment Rack 110 ...
Page 124: ...Chapter 5 Installing the Switch on a Wall 124 ...