Chapter 6: Building the Trunk with Default Stacking Ports 17 and 21
136
4. After setting the priority values, enter the EXIT command to return to
the Privileged Exec mode, as shown in Figure 67 on page 136.
Figure 67. Returning to the Privileged Exec Mode
5. Enter the WRITE command to save your change in the configuration
file. The switch displays the confirmation prompt in Figure 68.
Figure 68. Saving the Priority Values with the WRITE Command
6. To end the management session, enter the EXIT command.
7. Go to Chapter 8, “Cabling the Networking Ports” on page 167, to
continue with the installation.
awplus(config)# exit
awplus#
awplus# write
Building configuration ...
[OK]
awplus#
Summary of Contents for AT-x550-18XSPQm
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 50: ...Chapter 1 Overview 50 ...
Page 78: ...Chapter 2 Virtual Chassis Stacking 78 ...
Page 90: ...Chapter 3 Beginning the Installation 90 ...
Page 110: ...Chapter 4 Installing the Switch on a Table or in an Equipment Rack 110 ...
Page 124: ...Chapter 5 Installing the Switch on a Wall 124 ...