Chapter 3: Beginning the Installation
86
Figure 29 here and Figure 30 on page 87 list the items in the accessory
kit. Contact your Allied Telesis sales representative for assistance if any
item is missing or damaged.
Figure 29. Accessory Kit
Four AT-RKMT-J24 wall-
mounting brackets
One 2m (6.6 ft) local management
cable with RJ-45 (8P8C) and DB-9
(D-sub 9-pin) connectors.
Sixteen screws for attaching the AT-
RKMT-J24 wall brackets to the
switch.
Length: 6.0mm (0.2 in.)
Diameter: 4.0mm (0.2 in.)
One regional AC power cord
Four anchors for concrete walls:
Length: 29.6mm (1.2 in.)
Diameter: 6.0mm (0.2 in.)
Four screws for wood or concrete
walls:
Length: 32mm (1.3 in.)
Diameter: 4mm (0.2 in.)
Power cord retaining clip
Summary of Contents for AT-x550-18XSPQm
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 50: ...Chapter 1 Overview 50 ...
Page 78: ...Chapter 2 Virtual Chassis Stacking 78 ...
Page 90: ...Chapter 3 Beginning the Installation 90 ...
Page 110: ...Chapter 4 Installing the Switch on a Table or in an Equipment Rack 110 ...
Page 124: ...Chapter 5 Installing the Switch on a Wall 124 ...