3. Connect a “U”-tube manometer (or similar pressure gauge) to
the burner orifice (manifold) pressure tap.
4. Start tumble dryer and note pressure once flame is burning.
Remove regulator cap and adjust regulator screw until the
burner orifice pressure per applicable table is achieved. Re-
place regulator cap. Refer to
Figure 13
.
5. Commission tumble dryer for use.
Burner Orifice
TMB2015N_SVG
1
1.
Size Stamped on Orifice
Figure 14
Installing CE Gas Tumble Dryer
This information is to be used when installing gas tumble dryers
in countries and/or on gases different than the machine’s factory
configuration. Tumble Dryers are supplied from the factory for
operation with natural gas categories 2H, 2E, 2L, 2E(LL), 2E(r),
2E(R) or unregulated L.P.G. categories 3 B/P, 3+. To install tum-
ble dryers for regulated LPG category 3B/P requires a conversion
kit.
Tumble dryers are built in two different configurations:
• Natural Gas – regulated/governor
• Liquefied Petroleum Gas (L.P.G.) – not regulated/no governor
For converting models from Natural Gas to L.P.G., order the ap-
propriate kit listed in
Gas Requirements
section.
Serial plates supplied from the factory are configured for:
• Natural Gas, standard rate
• AT/BG/CH/CY/CZ/DK/EE/FI/HR/LT/NO/SE/SI/SK:
II
2H3B/P
• CH/ES/GB/GR/IE/IT/TR: II
2H3+
• DE/LU/PL: II
2E3B/P
• Natural Gas, Eco rate
• AT/BG/CH/CY/CZ/DK/EE/ES/FI/GB/GR/HR/IE/IT/LT/N
O/SE/SI/SK/TR: I
2H
• DE/LU/PL: I
2E
• L.P.G.
• BE/CH/ES/FR/GB/GR/IE/IT/TR: I
3+
These instructions pertain to the situations when the country of
use or gas supply is different than that on the serial plate. When
installing in a different country, peel off the appropriate country
sticker (included in literature packet with tumble dryer) and apply
it to the serial plate over the existing country information. Adjust
manifold pressure as applicable, per
Table 3
.
Units installed in France (FR) require a gas connection adapter
having ISO228 (BSPP, G) parallel threads and a sealing washer.
The adapter must have a sufficient flat area to seat the sealing
washer.
Adjusting Manifold Pressure for
Natural Gas G20 or G25
1. If country/gas category designation required is not listed on
the serial plate, affix the appropriate country/gas category la-
bel supplied over the main serial plate designations.
2. Verify gas supply pressure and adjust as necessary. Refer to
Figure 12
.
3. Verify manifold pressure. Refer to
How to Adjust Gas Valve
Governor/Regulator
and adjust as necessary.
Adjusting Supply Pressure for L.P.G.
G30 or G31
1. If country/gas category designation required is not listed on
the serial plate, affix the appropriate country/gas category la-
bel over the main serial plate designations.
2. Verify gas supply pressure and adjust as necessary. Refer to
Figure 12
.
Converting From Natural Gas to L.P.G.
or From Unregulated L.P.G. to
Regulated L.P.G.
1. Refer to table below to determine conversion kit part number
required.
2. Follow instructions supplied in conversion kit.
Model
CSA and AGA
Models
CE Models
120
44328804
44330303
170
44328805
44330304
200
44328806
44330305
CE GASES refer to
Installing CE Gas Tumble Dryer
section.
Start-Up Procedure
Turn on gas and check all pipe connections (internal and external)
for gas leaks with a non-corrosive leak detection fluid. Purge air
in gas service line by operating the tumble dryers in the drying
mode. If burner does not light and unit goes into lockout, press
start key on the control while the access panel is open. The con-
trol will then prompt for the start key to be pressed again to re-
start the cycle. Repeat these steps until burner ignites. Use pipe
compound, resistant to actions of L.P. gas, on all pipe threads.
Gas Requirements
©
Copyright, Alliance Laundry Systems LLC -
DO NOT COPY or TRANSMIT
41
Part No. 70532501ENR7
Summary of Contents for BA120E
Page 2: ......