Rockwell Automation Publication 22C-UM001J-EN-E - January 2017
45
Chapter
2
Start Up
This chapter describes how to start up the PowerFlex 400 Drive. To simplify
drive setup, the most commonly programmed parameters are organized in a
single Basic Program Group.
Prepare For Drive Start-Up
Before Applying Power to the Drive
1. Confirm that all inputs are connected to the correct terminals and are
secure.
2. Verify that AC line power at the disconnect device is within the rated
value of the drive.
3. Verify that any digital control power is 24 volts.
4. Verify that the Sink (SNK)/Source (SRC) Setup DIP Switch is set to
match your control wiring scheme. See
for location.
For information on...
See page
Viewing and Editing Parameters
IMPORTANT
Read the
General Precautions
section before proceeding.
ATTENTION:
Power must be applied to the drive to perform the following
start-up procedures. Some of the voltages present are at incoming line
potential. To avoid electric shock hazard or damage to equipment, only
qualified service personnel should perform the following procedure.
Thoroughly read and understand the procedure before beginning. If an event
does not occur while performing this procedure,
Do Not Proceed. Remove
All Power
including user supplied control voltages. User supplied voltages
may exist even when main AC power is not applied to the drive. Correct the
malfunction before continuing.
IMPORTANT
The default control scheme is Source (SRC). The Stop terminal is jumpered (I/
O Terminals 01 and 11) to allow starting from the keypad. If the control
scheme is changed to Sink (SNK), the jumper must be removed from I/O
Terminals 01 and 11 and installed between I/O Terminals 01 and 04.