Version October 2014
EN
11
agru SP 63-mobile User’s Manual
•
Once the heating element removal is confirmed, the pipes close in
on each other again.
•
This is followed by a steady force increase until the fusion force is
reached.
•
The pipe then cools down at the predefined force.
•
After the cooling time is over, the force is automatically removed
from the carriages and the pipe or fitting can be taken out of it.
4 Operation
Before putting the machine into operation, review the transport locks and
safety auxiliaries as well as the way the machine is set into its transport
box. Whenever the machine is moved or shipped, it has to be set into this
box and all locks and auxiliaries have to be engaged. The photographs
below help with understanding the transport helpers.
Important
When the printer is moved or shipped, the roll of labels in the
printer has to be removed
Info
When installing the reducer inserts, place the narrower inserts
into the inner clamps, the broader inserts, into the outer clamps.
The insertion and the removal of the inserts is performed
with-
out any tools
. The reducers are secured to the clamps by the
force of the magnets only.
4.1
Check-out, Turning on, Selecting the Display Language
Place the machine on a level surface and ensure it cannot slide or secure
it safely at the components to be jointed. Sufficient distance has to be kept
to other areas in the workshop, especially to those in which combustible
materials are used, in order for the heating element temperature of up
to 500°C (930°F) not to be hazardous. When starting the machine up,
remove the transport locks before applying power to the machine if it was
transported before start-up and the locks were engaged. Furthermore,
if the label tag printer ist planned to be used later on, connect it to the
machine and insert the roll of labels before the first welding operation.
Independently of the order of the explanations in this booklet, the steps
for setting the machine up and preparing everything for welding are
always performed in the following order (see the following figures for
reference):
1. Open the transport box.
2. Loosen the transport lock pole using the the star knob.
3. Take the dedicated plate for the facing tool and heating element out
of the box, set it on a level surface, making sure it will not slide, and
remove the transport lock of the heating element.
4. Take the base plate with the electronics and the mechanics out of
the box, set it on a level surface, making sure it will not slide, and
remove the transport lock of the movable carriages from in-between
the carriages (unlock the locking ball pin and remove it, then slide
the transport lock out of its seat in the opposite direction).
5. Take the facing tool out of the box and set it on its tabletop plate.
6. Take the battery charger out of the transport box.
7. Check the battery level and charge the batteries as needed.
8. Connect the mechanics and the heating element to the electronic
control unit.
9. Connect the V-lock power cable to its socket and the mains.
10. Switch the machine on and zero the movable carriage position.
11. Insert the reducers into the clamps.
Depending on the piece that is going to be welded, the outer clamps