Agilent G3437A Side-Mounted Thermal Conductivity Detector
Installation Instructions
7
2
Unfasten the main communication grommet and include the MSD heated
zone cable in the bundle. Refasten the grommet.
Figure 6
MSD heated zone cable included in main communication grommet
3
On the left side, unfasten the grommet and include the MSD heated zone
long cable. Leave the grommet unfastened until the communication cable is
routed at the end of the installation procedure.
Assemble the TCD frame
1
Attach the manual flow bezel to the third detector flow frame with three
M4 × 12 mm screws.
Figure 7
Attaching the manual flow bezel to the third detector flow frame
Grommet
MSD heated zone cable
Manual flow bezel
Screw locations
Third detector flow frame