![AGI 1549 Assembly Manual Download Page 37](http://html1.mh-extra.com/html/agi/1549/1549_assembly-manual_2866987037.webp)
8210-10003 R0
37
3.18. Install the Belt
This section describes how to install the conveyor belt in the U-trough. Refer to the packing slip for the length
of the conveyor belt used in the installation
Thread a Fish Tape through the U-trough Assembly
1. Place the rolled belt on a stand behind the hopper. Position the belt so that the outer diagonal cleats are
facing toward the spout end.
Belt Pattern Direction
2. Pull the conveyor belt over the top of the hopper roller, until just inside the hopper, as shown below.
Rolled Belt Behind a Typical Hopper
3. Feed a fish tape in at the spout, through the U-trough, and into the hopper.
4. Manually thread the belt around the transition rollers (1) in the hopper.
Important
Pass the belt underneath the protruding edge of the seal to prevent grain leakage.
UCX3 S-DRIVE FIELD LOADER – PORTABLE GRAIN BELT CONVEYOR