![AGI 1549 Assembly Manual Download Page 36](http://html1.mh-extra.com/html/agi/1549/1549_assembly-manual_2866987036.webp)
36
8210-10003 R0
Install the Weather Guards on the U-Trough Brackets
Assembly Notes:
•
Install the types of weather guard sections as shown on your particular conveyor model.
Important
Overlap the adjacent weather guard sections and align the holes as shown in the figure.
•
Connect each weather guard section to the U-trough brackets using a uni-mount plate cast, 3/8" x 1-1/4"
cap screw, and 3/8" lock nut. Leave the 3/8" lock nuts loose. (See
Install the Weather Guards on the U-
.)
•
Confirm all weather guard mount bar holes are aligned.
•
Tighten the 3/8" lock nuts after all of the weather guards have been installed.
A
Uni-Mount Plate Cast
2
3/8" Nylon Lock Nut (GR8)
1
3/8" x 1-1/4" Flat Head Socket Cap Screw
1
A
2
IMPORTANT:
IMPORTANT:
IMPORTANT:
Align holes
Bevelled edge orientation
Proper overlap
Belt travel direction
Belt travel direction through weather guards
Spout
Hopper
UCX3 S-DRIVE FIELD LOADER – PORTABLE GRAIN BELT CONVEYOR