3.7. Assemble the U-Trough Sections
1. Review the U-trough layout figure below for your specific conveyor model to determine the order in which
the U-trough must be connected together. Part numbers are shown for U-trough identification.
U-Trough Layout for CX
3
Models
15020165
15100208
15080018
15020166
2. Place the U-trough on two support stands to support each U-trough section. The support stands must be set
at equal height. Anchor the U-trough sections to the stands if necessary to prevent rolling.
Failure to secure the U-trough sections may result in personal injury.
3. Confirm that all U-trough sections are set level and oriented correctly.
4. Fasten U-trough flanges together with 1/2" x 1-1/4" bolts (1) and 1/2" lock nuts (2) as each U-trough section
is placed, starting at the hopper end and working toward the spout end. Try to make the U-trough
connection seamless by matching the curves of the edges. Use a punch to assist alignment.
Important
If the connection is off by more than 1/16", ground off the seam to make U-trough inside surfaces
level.
5. Install brace plates (3, 4) on each side of the U-trough seam. Use 1/2" x 1-1/2" bolts (5) and 1/2" lock nuts
(2).