:Anapurna M
4F
- Operator Manual
Stay ahead. With Agfa Global Services.
8
Maintenance - Test Menu
overheating the conveyor motor. Make sure you give a break of 1 minute before start-
ing the next belt test.
F1 :
RUN
F2 :
STOP
1.4
Dir test (F5).
The direction test is a quick test to check the bi-directional allignment of your shuttle.
It will print 15 lines per color from right to left and from left to right. Per block you will
have to see 15 clear lines. If they start looking double and you can count 0 lines, the
bi-directional setting is not correct. Adjusting the bi-directional allignment is discussed
in Section B - 5.5.
The F5 function will print the bi-directional test file in 720 dpi.
size test chart: 65 x 7 cm