F
2
9102
6101
.fm
IDM
English
15
Use and maintenance manual
Booklet
2
Basic MACHINE ASSEMBLY
2
The creation of the foundations and the fastening of the machine are fundamental
operations for ensuring the stability and correct functioning of the machine.
1 –
Position the machine in the area designed to mark the points corresponding to the
perforation.
2 –
Perform holes and insert the supplied dowels
(A)
.
3 –
Re-position the machine and fasten it to the floor with screws
(B)
.
Important
If necessary, insert metal plates (C) between the screws and the floor.
RECOMMENDATIONS FOR CONNECTIONS
21
Important
Connections should be performed following the manufacturer’s indications in
the enclosed diagrams. Personnel authorised to perform this operation must
possess technical skills, abilities and have acquired certified experience in the
specific field and must perform connections professionally, taking into account
all the regulative and legislative requirements. When connections are complet-
ed, make sure these requisites were observed by performing a general inspec-
tion before making the unit operative.
IDM-29145200900.tif
(A)
(C)
(B)