63
10.
Dry fit the smaller front tunnel balsa floor
baffle for proper fit. Apply medium CA glue
to baffle and install.
11.
Install the front tunnel balsa floor baffle as
shown.
12. Gather the two supplied silicon tubes for
making the vibration isolation mounts.
Mark eight 7/8” pieces onto each tube.
Note:
The silicon tubing may have already been
pre-cut for you, if so skip this step.
13.
Cut (16) 7/8” pieces, of the silicon tubing as
shown.
Note:
The silicon tubing may have already been
pre-cut for you, if so skip this step.