1 7
SECTION 7.1
PREPARING THE OPENING
Before installing the fire, check the flue for correct operation using a smoke pellet, all of
the smoke should be drawn up the flue and exit correctly from the terminal.
If problems are found DO NOT fit the fire until corrective measures have been
completed.
Protect the decorative hearth whilst pushing the convector box in and out of the
opening. Part of the packaging or a dust sheet can be used.
Before running the gas supply into the opening, offer up the convector box to the
fireplace to check the fit is good.
Ensure that it slides in correctly, the sealing face sits flat and square to the wall or back
panel, and that the base is level with the hearth as no leaks are permissible here.
At this stage it is essential to ensure that the spigot outlet of the fire is not obstructed in
any way.
Remove the fire box and apply the self adhesive sealing strips around the edge of the
rear of the firebox frame, approximately 5mm in from the edge.
CABLE FIXING:
Using the template provided, place this within the opening with the bottom edge of
the template level with the hearth.
Drill 3 x 6mm holes through the template as shown in the diagram and fit the wall plugs
and screw eyes supplied.
Screw Eye Posi
ti
ons
115mm
195mm
520 Max
420 Min
Summary of Contents for Eco4
Page 42: ...4 2 S E C T I O N 1 9 LIST OF SPARES Eco4 Manual Control ...
Page 43: ...4 3 S E C T I O N 1 9 Eco4 Slide Control ...
Page 44: ...4 4 S E C T I O N 1 9 Eco4 Remote Control 1C 2C 4C 5C 3C 6C ...
Page 45: ...4 5 S E C T I O N 1 9 Eco4 Ceramics ...
Page 46: ...4 2 4 6 S E C T I O N 1 9 Eco4 Ceramics A22 A23 ...