SYSTEM INSTALLATION
Version 1.0
Acme Packet, Inc. Technical Publications
39
Tapped Hole Rack
Installation
This section explains how to mount the Net-Net 6300 mounting rail assembly in a
tapped hole equipment rack.
To install the stationary rails on the front of a tapped hole equipment rack:
1.
Locate the following components:
•
2 x stationary rail sections
•
4 x 10-32 x 5/8” screws
•
2 x mounting spacers
2.
Line up the painted side of the stationary rail with an appropriate mount point
on the front of the equipment rack.
3.
Place 2 x 10-32 screws through the mounting spacer and through the stationary
rail ear.
4.
Screw in and secure the stationary rail to the equipment rack. Refer to the
following exploded view of procedure:
Do not completely torque the screws; leave a small amount of play at this point.
Summary of Contents for Net-Net 6300
Page 6: ...vi Net Net 6300 System Hardware Installation Guide Version 1 0...
Page 9: ...ABOUT THIS GUIDE Version 1 0 Acme Packet Inc Technical Publications ix...
Page 10: ...x Net Net 6300 Hardware Installation Guide Version 1 0 ABOUT THIS GUIDE...
Page 26: ...24 Net Net 6300 Hardware Installation Guide Version 1 0 COMPONENT OVERVIEW...
Page 34: ...30 Net Net 6300 Hardware Installation Guide Version 1 0 GRAPHIC DISPLAY...
Page 102: ...100 Net Net 6300 Hardware Installation Guide Version 1 0 MAINTENANCE INTRODUCTION...
Page 106: ...100 Net Net 6300 Hardware Installation Guide Version 1 0 SAFETY...
Page 116: ...110 Net Net 6300 Hardware Installation Guide Version 1 0 GLOSSARY...