129
Installing the server in the system rack
Warning! To avoid injury, care should be taken when
pressing the inner rail release latches and sliding the
component into the rack. It also recommended that two or
more people help in installing the server to the rack to
minimize the chances of accidents.
1
Press the release latch on both sides of the rack mounting rails.
2
Carefully align the inner rails attached to the server with the fully
extended mounting rails on the rack, then push the server into the
rack until you hear an audible click.
Summary of Contents for Altos G540 Series
Page 1: ...Acer Altos G540 Series User s Guide ...
Page 10: ...x ...
Page 11: ...1 System tour ...
Page 24: ...1 System tour 14 System boards Mainboard ...
Page 34: ...1 System tour 24 ...
Page 35: ...2 System setup ...
Page 44: ...2 System setup 34 ...
Page 45: ...3 System upgrade ...
Page 78: ...3 System upgrade 68 ...
Page 79: ...4SystemBIOS ...
Page 108: ...4 System BIOS 98 ...
Page 109: ...5 System troubleshooting ...
Page 120: ...5 System troubleshooting 110 ...
Page 121: ...Appendix A Server management tools ...
Page 129: ...Appendix B Rack mount configuration ...
Page 130: ...This appendix shows you how to set up the Altos G540 server in a rack mount configuration ...