System Configuration
3-55
3.
Pull-out the metal bar from the lower end and unhook the upper
end from the housing roof.
Figure 3-45
Pulling-out the Metal Bar
4.
Remove the metal cover of the compartment where you intend
to install a power supply module.
5.
Unpack a new power supply module.
6.
Firmly hold the power supply and align it with a compartment on
the power supply rack. Pressing the holding clips on the sides,
push back the power supply until its golden fingers completely fit
into the slot on the power backplane. See Figure 3-46.
Summary of Contents for Altos 19000PRO4
Page 1: ...AcerAltos 19000Pro4 AcerAltos 19000Pro4 System Guide ...
Page 32: ...1 14 AcerAltos 19000Pro4 System Guide ...
Page 39: ...2 6 AcerAltos 19000Pro4 System Guide 2 2 2 Mouse Figure 2 4 Connecting a Mouse ...
Page 40: ...Setting Up the System 2 7 2 2 3 VGA Monitor Figure 2 5 Connecting a VGA Monitor ...
Page 64: ...3 20 AcerAltos 19000Pro4 System Guide Figure 3 21 Removing the Thermal Air Guide ...