ABEM Terrameter LS
61
Figure 68. Result of Create Electrode Position
6.10.2 Performing a VES Measurement
•
Starting a VES measurement
―
Set the active electrode position as described above
―
Make certain that the electrodes have actually been moved to the desired
physical position and check that everyone stands clear of the electrodes and
cables
―
Navigate to the
“Measure/Progress” View
. Quickest way to do this is to press
<Play/Pause>
―
Highlight the “<Start Measuring>” row in the progress list
―
Press <Ok>
―
The “Electric Shock Warning” will now be displayed
Warning!
Do not press <OK> until it is verified that no person or
animal is touching any part of the electrode cables,
connectors or electrodes!
Summary of Contents for Terrameter LS
Page 2: ...ABEM Terrameter LS ...
Page 10: ...ABEM Terrameter LS v ...