
2
80
Zenith ZBTS T-series 100-1200A, I N S TA LL ATI O N A N D O PER ATI N G I N S TR U C TI O N
Ekip
3
4
1
2
—
Fig. 8.1 First step: Remove carefully the factory mounted auxiliary power supply module OXEA1 and
signal modules from the fixed Bypass switch. There is no need to remove the existing wirings.
—
Fig. 8.2 Step two: Mount the Ekip –modules to the combination of auxiliary power supply module
and signal modules, then place the entire assembly back to the fixed Bypass switch.
8.1.1 Mounting of Ekip –modules to the fixed Bypass switch
Summary of Contents for Zenith ZBTS T Series
Page 2: ...2 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Page 6: ...6 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Page 10: ...10 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Page 44: ...44 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Page 58: ...58 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Page 68: ...68 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 1 ...
Page 100: ...2 100 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 3 ...
Page 103: ...2 103 34ZBTS _ 30 1200A rev A 1SCC303043M0201 4 ...
Page 105: ...2 105 34ZBTS _ 30 1200A rev A 1SCC303043M0201 4 ...
Page 107: ...2 107 34ZBTS _ 30 1200A rev A 1SCC303043M0201 4 ...
Page 108: ...2 108 Zenith ZBTS T series 100 1200A INSTALL ATION AND OPER ATING INSTRUCTION 4 ...
Page 109: ...2 109 34ZBTS _ 30 1200A rev A 1SCC303043M0201 4 ...