Commissioning of the KNX function via ABB DCA SmartTouch 10 (from
ETS5)
Product manual 2CKA001473B5343
│
76
9.5 Commissioning
sequence
To be able to work with the DCA commissioning tool as effectively as possible, the following
work sequence (standard workflow) is recommended:
1. Start the ETS software (see chapter 9.2.1 “Starting the DCA“ on page 71).
2. Create a new project or open an existing one.
3. Open the configuration surface via the "DCA" tab.
4. Configure basic settings for the touchdisplay.
5. Create the navigation structure (see chapter 9.7 “Creating the navigation structure“ on page
94).
6. Configure the operating pages (insert and configure control elements).
7. Configure the applications and application pages.
8. Edit the available communication objects.
9. Create group addresses and allocate the correct data point type (DPT) to all group
addresses used in the device (e.g. function: 1.001 switch).
Notice
Alternatively the allocation of the group addresses to the communication objects
can also be made in the "Communications objects" tab of the ETS.
9.6
Configuring basic settings for the panel
The basic settings for the panel can be specified beforehand.
1. Open the "Applications" tab in the library area.
2. Open "System settings".
– The basic settings are displayed in the "Parameter" area and can be edited (see chapter
9.6.1 “Basic settings (system settings) of the panel“ on page 77).
– Available communication objects for certain functions are displayed in the
"Communication objects" area and can be used.
– Group addresses can be allocated via the "Group addresses" area.