Pressurising the poles
Assembly Instructions
28
1HSB435410-2 enrev1
6.2 Gas filling with SF
6
gas
Figure 6-1. Gas filling.
1.
Place the gas cylinder (1) in a protected area.
2.
Check the filling pressure on the circuit-breaker’s rating plate.
3.
Fit the regulator (2) on the gas cylinder. Set the right filling pressure,
compensated for the temperature as set out in
Table 6-1
on the regulator.
4.
Pull the sealing rings off the density monitor with your fingers (3).
N.B. Do not use sharp tools.
5.
Lubricate the sealing rings thoroughly with grease “G” and refit them on the
density monitor.
Item
1
Gas cylinder
2
Regulator
3
Density monitor
4
Coupling
5
Valve
6
The breaker’s gas valve
7
Hose
8
Adaptor
9
Nipple with union nut
10
Equal union cross
11
Valve
1
3
2
4
7
5
6
8
9
B10016
11
10
Summary of Contents for SF6 LTB 245E1 BLG 1002A
Page 1: ...Product Manual 1HSB435416 2 en Rev 1 LTB 245E1 BLG 1002A 3 pole operation ...
Page 92: ...ABB Switchgear SF6 Circuit Breaker Circuit breakers HPL and LTB 1HSB445409 1 en0 Lubricants ...
Page 198: ......
Page 199: ......
Page 209: ......
Page 210: ......