6
5
4
3
2
1
is strictly forbidden. c ABB
disclosure to third parties without express authority
formation contained therein. Reproduction, use or
We reserve all rights in this document and in the in-
Based on
Prepared
Approved
Resp dept
Rev ind
1
2
3
4
5
6
A
B
C
D
Lang
Sheet
Cont
/
D
A
B
C
List of Revisions
Rev Index
Date
Revision text
Prepared
Approved
Circuit Diagram
1HSB543212-GKV
R1
A
2011-09-16
2011-09-23
es
Gutman Anton
PPHB/BOD
Gutman Anton
Stark Mikael
First edition
A
Stark Mikael
2011-09-23
1HSB543212-GKG
OPERATING MECHANISM BLK
MECANISMO DE OPERACION BLK
DIAGRAMA DE CIRCUITO
Summary of Contents for SF6 LTB 245E1 BLG 1002A
Page 1: ...Product Manual 1HSB435416 2 en Rev 1 LTB 245E1 BLG 1002A 3 pole operation ...
Page 92: ...ABB Switchgear SF6 Circuit Breaker Circuit breakers HPL and LTB 1HSB445409 1 en0 Lubricants ...
Page 198: ......
Page 199: ......
Page 209: ......
Page 210: ......