Inspection intervals
Operating and Maintenance Instructions
12
1HSB435409-100 en1
3.4 Maintenance category C
To be inspected
Inspection interval
Measures / Instructions /
Tools
1.
Ocular inspection
15 years or 5,000 mech. CLOSE/
OPEN operations.
Check external cleanliness, heater
element function, gas pressure, valves
and drainage holes.
No special tools needed.
See
Chapter 2.1.3
and
Chapter 2.1.4
and 1HSB515409-100 for BLG 1002A
or 1HSB535409-100 for BLK 222.
2.
Rating plates
15 years or 5,000 mech. CLOSE/
OPEN operations.
Make a note of the serial number.
3.
Operation counter
15 years or 5,000 mech. CLOSE/
OPEN operations.
Make a note of the number of
operations.
4.
SF
6
gas
•
Filling of gas (if
necessary)
•
Dew point at normal
gas pressure in the
circuit-breaker.
15 years or 5,000 mech. CLOSE/
OPEN operations.
Gas filling equipment.
See Assembly instruction for applicable
circuit-breaker, ch 6.
Dew point maximum - 5
˚C
at rated
filling pressure and + 20
˚C
temperature.
5.
Insulators
•
Visual inspection and
cleaning.
15 years or 5,000 mech. CLOSE/
OPEN operations.
Spray and rub the insulators clean.
Check cementing, bolts and nuts.
Spray equipment, clothes and
wrenches.
See
Chapter 2.1.4
Summary of Contents for SF6 LTB 245E1 BLG 1002A
Page 1: ...Product Manual 1HSB435416 2 en Rev 1 LTB 245E1 BLG 1002A 3 pole operation ...
Page 92: ...ABB Switchgear SF6 Circuit Breaker Circuit breakers HPL and LTB 1HSB445409 1 en0 Lubricants ...
Page 198: ......
Page 199: ......
Page 209: ......
Page 210: ......