Delivery
Assembly Instructions
6
1HSB435410-2 enrev1
3.2 Unpacking
The operating mechanism with blocking beams is packed in a wooden crate or on a
pallet. The crate is marked with the case number and the gross weight. Other
information is written on a plywood board/label, which is attached to two of the
crate’s sides.
The operating mechanism must be lifted using the lifting eyes on top of the cabinet,
see
Figure 3-2
. Slings must not be placed around the cabinet when lifting.
One sling should be attached to the lifting eye and another sling attached around the
bracket on the bottom when the operating mechanism is supplied in a crate, see
Figure 3-2
.
The blocking beams should be stored for future maintenance and overhauling.
The circuit-breakers shall be kept in the transport packaging until just before
assembly.
All packing material can be recycled.
Figure 3-2. Lifting the operating mechanism
Supplied in a crate
Supplied on a pallet
B20023
Summary of Contents for SF6 LTB 245E1 BLG 1002A
Page 1: ...Product Manual 1HSB435416 2 en Rev 1 LTB 245E1 BLG 1002A 3 pole operation ...
Page 92: ...ABB Switchgear SF6 Circuit Breaker Circuit breakers HPL and LTB 1HSB445409 1 en0 Lubricants ...
Page 198: ......
Page 199: ......
Page 209: ......
Page 210: ......